Controlled-products-systems-group 3265-267H Manual de usuario Pagina 10

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 72
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 9
Header Bracket
Chain Pulley
Bracket
Temporary
Support
Header Wall
Garage
Door
Rail
Clevis Pin
5/16"x2-3/4"
Ring Fastener
Header Bracket
Chain
Pulley
Bracket
Rail
10
Clevis Pin
5/16"x2-3/4"
Ring Fastener
INSTALLATION STEP 3
Attach the Rail to the Header Bracket
Position the opener on the garage floor below the
header bracket. Use packing material as a protective
base. NOTE: If the door spring is in the way you’ll need
help. Have someone hold the opener securely on a
temporary support to allow the rail to clear the spring.
Position the rail bracket against the header bracket.
Align the bracket holes and join with a clevis pin
as shown.
Insert a ring fastener to secure.
HARDWARE SHOWN ACTUAL SIZE
Vista de pagina 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 71 72

Comentarios a estos manuales

Sin comentarios