Controlled-products-systems-group L3NX Manual de usuario Pagina 19

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 50
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 18
VIKING TECHNICAL SUPPORT 1.800.908.0884
17
GATE OPERATOR INSTALLATION
! TECHNICAL TIP: Before starting the installation procedure;
•
Openandclosethegatemanually,makingsurethereissufcientspacebetweenthegate
and adjacent walls.
•
Check that the wheels are turning freely on the track and there are no restrictions while
pushing the gate to the open and closed positions.
•
Conrmthatthereisadequatespacingfortheguiderollersandthatthereareno
restrictions throughout the travel of the gate.
STEP 1
Before securing the chassis to the
concrete pad or posts, make sure
the gate and operator is LEVEL and
PARALLEL. Minimum distance between
the operator and gate is 3”.
STEP 2
Chain Installation: Before welding the
provided chain brackets, make sure the
chain will be in a straight line with, and at
the same height as, the chain leaving the
gate operator rollers.
14.375"
Vista de pagina 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 49 50

Comentarios a estos manuales

Sin comentarios