Controlled-products-systems-group L3NX Manual de usuario Pagina 21

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 50
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 20
VIKING TECHNICAL SUPPORT 1.800.908.0884
19
A
Low Voltage Supply Option
TIP:
The operator is equipped with a Modular Power Box that can be relocated to
provide power for low voltage installations. Supplies 24v AC to the operator.
! Caution: Always turn off power breakers when working with high voltage. DO NOT
connect the “Power Harness” to the Control Board until the electrical installation is
complete and ready for verification.
ELECTRICAL INSTALLATION
Remove the “Power Box” from the operators chassis and relocate to the nearest high
voltage source (115v or 230v single phase AC). Follow local codes or guidelines.
Solar Supply Option
Vikings Solar Package (part # VA-SOCHP) is an efficient and effective solution to
powering the operator with solar energy. (See page 46 for package details)
Disconnect the operators
power harness and use the
Solar Harness.
Connect the two
panels in series.
Connect the batteries
in series.
! IMPORTANT: The number of cycles achieved daily is dependent on the average solar
radiation of the geographic location and the power consumption of all accessories
being used. Increased panel and battery capacities may be required. See Appendix C
on page 45 for more important information regarding solar applications.
B
MAXIMUM DISTANCE:
400 ft. with 10 AWG wire
! Tip: For increased solar efficiency:
By activating the “Pre-Warning”
feature , the “Brake” terminals
will provide power to all non-essential
controls beginning 3 seconds prior to
gate movement and while the gate is
moving. (page 25)
B
A
Vista de pagina 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 49 50

Comentarios a estos manuales

Sin comentarios